india π§ GBA chief speeds up Ejipura buffer road work
The GBA Chief Commissioner, M. Maheshwar Rao, directed officials to fast-track the 5.45 km buffer road construction in Bengaluru. This road spans from Lower Agaram Junction to Sarjapur Road via Ejipura. The project, which has 5.34 acres from the Defence Department, has 90% of its retaining wall done as of August 13, 2026. Rao mandated designs that allow rainwater percolation and specified stormwater drains for the low-lying S.T. Bed Colony. Furthermore, he ordered expediting the Ejipura flyover and adding a cycle track. π§